
Inside the garage
The shortest route when the distribution board sits in the house next door. Dry, protected, and the cable stays inside the garage.
Wallbox in Heinsberg and the surrounding district
Jansen GmbH Gebäudetechnik
Jansen GmbH Gebäudetechnik installs charging points at the house: check the meter cabinet, run the cable, mount the wallbox, register it with the grid operator, commission it. One company for the whole way from the incoming supply to the plug.
Charge level
0%
This is where every car starts. What lies in between is on this page.
01 / 08

The unit on the wall is the last step. Before it come questions that can only be answered inside the house. These four are the ones we look at first.
We look at what is already there: the meter cabinet, the main fuse, the free positions in the distribution board and the condition of the existing equipment. That decides whether a charging point can be added without rebuilding.
From the distribution board to the parking space: length, routing, wall penetrations, method of installation. The route sets the cross section of the cable and a large part of the work.
A charging point gets a circuit of its own with proper protection. That includes the right overcurrent device and the residual current detection the unit calls for.
A charging point at a house is registered with the grid operator, and larger connected loads additionally need its consent. We handle that notification so it does not get left lying.
Almost nobody does. That is exactly why we come and look at it.
Four places where we mount wallboxes. The place decides the type of unit, the cable route and the protection against weather.

The shortest route when the distribution board sits in the house next door. Dry, protected, and the cable stays inside the garage.

Possible where the unit is built for outdoor use. We watch the mounting height, the cable routing and a position where nobody walks across the lead.

Free standing on a pedestal or on the nearest wall. What counts here is how the cable is routed and where the car actually stands.
There is often no wall, so we first settle what the unit goes on: a post, a stand or a back panel. The cable route then usually runs underground, and that decides the digging.
Five steps. Each one ends with something you have in your hand.
You tell us which car is to be charged and where it stands. A first contact needs no more than that.
Result: an appointment
We look at the meter cabinet, the distribution board, the cable route and the parking space, and measure the route. That also settles which type of unit suits the position.
Result: a survey of the installation
You get the items in writing: unit, cable, protective devices, installation and the registration. It lists what we saw on site and nothing beyond that.
Result: a quotation on paper
We register the charging point with the grid operator, run the cable, fit the protective devices and mount the unit.
Result: a finished installation
We commission the installation, take the measurements, hand over the documentation and walk you through the unit.
Result: the first charge
Write us a line about which car is to be charged and where the charging point should sit. We will get back to you and arrange an appointment at the house.
Prefer to talk? The number is in the header of this page, in the footer and in the bar along the bottom.
Types of unit, mounting positions and connections as they occur at a home. Click a picture to see it large.
Tell us where the car stands. The rest we settle on site.
A wallbox page fills up with numbers very quickly. We write down only what we can stand behind.
What we are asked most often on the telephone, and how we answer it.
It depends on the house: on the distribution board, on the cable route, on the type of unit and on whether anything in the meter cabinet has to be added. We name the price in the quotation after the appointment, not before. A figure written here would be wrong at every second house.
Yes. A charging point at a house is registered with the grid operator, and larger connected loads additionally need its consent. We handle the notification as part of the job.
Yes, where the unit is built for outdoor use. At the appointment we settle the mounting height, the weather protection and the cable routing, so that the lead does not lie across the path.
Yes. A charging point gets a circuit of its own with the proper overcurrent device and the residual current detection the unit calls for. That is why we look at the distribution board before promising anything.
The cable route decides that. A short run from the board into the adjoining garage is one thing, a cable through the house and across the yard is another. We tell you after the appointment, not before.
National, state and local programmes change, and some are closed for periods at a time. We name no figure here. Ask your grid operator or the responsible body for the current position; we supply the details of the installation that are needed for it.
Do raise it with us. We will look at what you have in mind and tell you whether it suits your distribution board and your parking space.
Ask us and we will come and look at the installation. With several charging points the distribution board, the available capacity and the way it is shared all come into it, and that is a conversation on site.
The company sits in Gangelt and drives to Heinsberg, to its villages and across the rest of the district of Heinsberg.
Your village is not listed? Ask anyway and we will settle it on the telephone.
One call, or four fields in the form, and the appointment is set.